Step | | Procedure & Parts & Tools |
1 |
|
DRAIN AND OPEN TANK, REMOVE BATTERIES AND SHROUD
Ratchet-Socket metric 13mm |
|
Wrench-Allen metric 10.0mm |
|
|
2 |
|
LOCATE THE SOLUTION VALVE/PUMP WIRE BUNDLE IN THE CLUSTER OF CONNECTORS ON THE RIGHT.
|
4 |
|
INSERT THE VOLTMETER LEADS INTO VALVE/PUMP PLUG AT PINS 2 AND 5. DROP THE DECK, ENGAGE SOLUTION SYSTEM AND FORWARD DRIVE. PUMP OPERATES ON DUTY CYCLE, THE VOLTAGE WILL RISE AND FALL RAPIDLY.
Volt meter (True RMS capable) |
|
|
|